NEW MINING CO. 01 / 12
Hosting offer • 2026

Hosting
in North
Dakota.

Ready capacity for Bitcoin mining in North Dakota and Minnesota. Active air cooling, UL-certified builds, 24/7 monitoring.

17.7 MW
Available capacity
$0.062/kWh
Starts at
95%
Uptime
5
Live sites
SCROLL ↓
02
NEW MINING CO. 02 / 12
01 — Offer at a glance

Six numbers
worth knowing.

Capacity
17.7MW
Combined capacity across five sites
Starts at
$0.062/kWh
Pay per consumption, no hidden fees
Uptime
95%
MISO grid, stable ND power delivery
Cooling
Air/active
Containers winter-hardened for ND
Minimum order
Anysize
From a single miner to a full container
Support
24/7
Personal Foreman dashboard, direct line to ops
03
NEW MINING CO. 03 / 12
02 — Footprint

Five sites.
One operator.

Four live sites in North Dakota and Minnesota plus a Langdon build-to-suit pad with headroom for 10–15 MW.

NEW MINING CO. 04 / 12
Live • Grand Forks, ND
Site A — Grand Forks, ND

Grand
Forks.

47.9081° N 97.1080° W
6 MWCapacity
6Containers
OnlineStatus
  • Upstream Data 20-ft containers — all in production
  • Winter-hardened for ND: snow barriers, insulated walls
  • UL-certified, fully code-compliant
  • Ready for immediate miner placement
NEW MINING CO. 05 / 12
Moorhead containers Live • Moorhead, MN
Site B — Moorhead, MN

Moorhead.

46°54′45.0″ N 96°44′39.8″ W
4 MWCapacity
4Containers
OnlineStatus
  • Containers hashing right now
  • Snow-barrier build for MN winters
  • LAN fabric live, fleet monitoring wired in
  • Run by our in-house ops team
Moorhead detail Moorhead location Moorhead overview
NEW MINING CO. 06 / 12
Live • Bemidji-Scribner, MN
Site C — Bemidji-Scribner, MN

Bemidji-
Scribner.

47.5229° N 95.0137° W
6 MWCapacity
10Containers
240Slots per container
  • Ten active-air containers — our most recent deployment
  • 240 miner slots per container, dense layout
  • Single-phase PDU, per-miner metering
  • 5475 Scribner Rd NW, Bemidji, MN 56601
Scribner containers Scribner container interior Scribner container detail
NEW MINING CO. 07 / 12
Puposky site Live • Bemidji-Puposky, MN
Site D — Bemidji-Puposky, MN

Bemidji-
Puposky.

47.6652° N 94.9073° W
4 MWCapacity
4Containers
C19Power connector
  • C19 cables run to every rack
  • High-volume intake for active air cooling
  • Networking and hot-aisle rear panels included
  • 20250 Puposky Rd NW, Bemidji, MN 56601
Internal network routing C19 cable close-up Puposky overview
NEW MINING CO. 08 / 12
Build-to-suit • Langdon, ND
Site E — Langdon, ND

Langdon.
10–15 MW.

48°44′48.2″ N 98°22′01.5″ W
15 MWUp to
3 moBuild time
95%Uptime
  • Greenfield build-to-suit — capacity sized to your fleet
  • Order to power-on — about 3 months
  • Private land — buy outright or lease through the utility
  • 95% uptime backed by the utility
Langdon substation Langdon parcel Langdon location
09
NEW MINING CO. 09 / 12
03 — Commercial terms

No small print.
Everything on the table.

Setup fee
$35 / miner
Deposit
1 month
Prepayment
1 month
Contract term
12 months
Billing
Per consumption
Minimum order
Any size
Miners
Your own or buy from us
Monitoring
Foreman dashboard
Support
24 / 7 direct
Onboarding
Under 7 days
Price
Starts at $0.062 / kWh
Uptime
95% grid SLA
10
NEW MINING CO. 10 / 12
04 — Why North Dakota

Why
North Dakota.

01

Cold air — cooling on the house

Winter averages sit deep below freezing. Active-air containers run through the season without chillers: lower OPEX, more hashrate per kilowatt.

02

Stable MISO grid

Sites plug into the MISO market. Deep generation mix, predictable day-ahead pricing, decades of industrial-load delivery.

03

Miner-friendly state

North Dakota welcomes digital infrastructure. No state-level hostility, clean permitting path, local workforce within 100 km.

04

USD jurisdiction

Capital sits inside the US. Dollar contracts, no FX friction, full US legal standing.

NEW MINING CO. 11 / 12
05 — Who we are

Operators,
not landlords.

New Mining Company has built and run mining sites since 2017. From a single 1 MW container outside Moscow to 65 MW of live infrastructure in the US — every site built by the same hands: cable pulled, power energized, monitoring wired in.

Your miners are serviced by the same team that built the walls around them. No middlemen, no ticket queues — direct line to the people who actually do the fixing.

IEEE Senior Member MIPT 9 yrs in mining ND • MN • TX • AR
65 MW
Live fleet
9 yrs
In business
5
US sites
24/7
On-site ops
NEW MINING CO. 12 / 12
Ready to deploy?

Let’s lock in
your megawatts.

Pick any channel — all three go straight to Denis. Founder, IEEE Senior Member, and hands-on with hosting operations day to day.